Phone: (425) 290-7803
Fax: (425) 355-1965
Industrial Projects
Bakery Chef

In this project we provided the electrical installation for a new shipping conveyor system and pancake batter mixer. All materials had to be preassembled away from the food manufacturing areas.

Reservoir

This facility provides water for the Cedar River which in turn provides drinking water for most of King County. These pumping barges located in the reservoir are used to pump water over the dam when the water level gets too low. We test and install wire as needed in order to keep pumping barges operational.

Wastewater

This underground sewage lift station consisted of 3 200HP pumps. We provided all of the electrical for the building, the pumps, the controls, wet well and dry well telemetry systems. Most of the work was below the year round water table which required extra measures to keep water out of conduits and equipment.

Home | Industrial | Commercial | Contact | About | Testimonials | Employee Home | Customer Home | Admin Login
PBW CMS by Point B Web
Site updated on December 6, 2017, 2:21 pm